Skip to Content Skip to Main menu

Home > 설치사례 > >

사이트정보

어플리케이션 Sports Flood Lighting
장소 양구, 한국
설치제품 MSF 400W / MSF 800W
조명설치 GigaTera Technical Team

To expand and diversify the base of sports for everyone, Yanggu-gun of Gangwon-do constructed an exclusive baseball stadium with its left and right fields each spanning 90 m and its center field spanning 100 m in Ha-ri, Yanggu-eup, with an invested budget of KRW 1 billion. In the stadium, Maloolighting LED sports lighting at a major league level are installed all throughout the stadium as the first of its kind in Korea. After replacing the lighting fixtures, a nighttime exhibition match was held there for the first time, and it was reported that about 200 persons, including the heads of local institutions and baseball players, participated in the lighting ceremony.

 TOP